imao takuma works

work with

“work with” is art project that produced Intermittently by IMAO Takuma.
The project is intervening the infrastructure of space that exhibition hold using the way of sculpture and sound art.

work with #8(旧珠洲市立中央図書館空調設備)

 

Ishikawa,Japan/2021

 

Intervened Air conditioning equipment of “former Suzu City Central Library” .
“work with #8” was published in “OKU-NOTO Triennale” .

 

Official site:https://oku-noto.jp/en/index-en.html

 


work with #9(CLUB METRO空調設備)

 

Kyoto,Japan/2020

 

Intervened Air conditioning equipment of the a long-established underground club in Kyoto.
“work with #9” was published as IMAO Takuma's solo exhibition.
It was done at a time when the club was on the brink of a Corona disaster.

 

Official site:https://chronkyoto.wixsite.com/imaotakuma-workwith9

 


work with #7(アトリエももさだ空調設備)

 

Akita,Japan/2019

 

Intervened Air conditioning equipment of “Gallery Atelier Momosada” that renovated from national rice warehouse.
“work with #7” was published in “VOID” which is event planed by MIYAMOTO Kazuyuki and IMAO Takuma.

 

Exhibition Link:https://www.artscenter-akita.jp/archives/9283


work with #6(金沢市民芸術村アート工房空調設備)

 

Ishikawa,Japan/2019

 

Intervened Air conditioning equipment of Kanazawa Citizen's Art Cente PIT5 Art factory that renovated from warehouse of spinning factory.
“work with #6” was published as “Actionplan” organized by Kanazawa Citizen's Art Center.

 

Exhibition Link:https://www.artvillage.gr.jp/event/4550

Review:https://bijutsutecho.com/magazine/review/19410/pictures/3

 


work with #5(ギャラリーフロール空調設備)

 

Kyoto,Japan/2016

 

Intervened Air conditioning equipment of “Gallery Fleur” at 2nd floor that Kyoto Seika University runs.
“work with #5” was published in “Chain and blink” which is exhibition planed by people around Seika University.

 

Exhibition Link:https://www.kyoto-seika.ac.jp/fleur/past/2016/0603rensatomatataki/index.php

 



work with #4(元崇仁小学校4F空調設備)

 

Kyoto,Japan/2016

 

Intervened Air conditioning equipment of former Sugin elementary school in Sugin area where Kyoto City University of Arts will move in 2023.
“work with #4” was published in “Open Diagram” which is exhibition held as pre-project to move Kyoto City University of Arts.

 

Exhibition Link:https://www.kcua.ac.jp/20160210_opendiagram/

 

 



work with #3(ホテルグランビア大阪空調設備)

 

Osaka,Japan/2015

 

 

Intervened Air conditioning equipment of the attic of hotel room at 26th floor.
“work with #3” was published in Theme Exhibition in ART OSAKA(art far held at Hotel Granvia Osaka).

 

Exhibition Link:https://apca-japan.org/project/2108/

 



work with #2(旧日本銀行広島支店空調設備)

 

Hiroshima,Japan/2015

 

Intervened Air conditioning equipment of former Hiroshima branch building of bank of Japan.
“work with #2” was published in exhibition of open call program of Hiroshima City Museum of Contemporary Art.

 

Exhibition Link:https://www.hiroshima-moca.jp/exhibition/dokodemo2015/




work with #1(京都市立芸術大学大学会館ホール空調設備)

 

Kyoto,Japan/2015

 

Intervened Air conditioning equipment of the circular hall of university.
“work with #1” was published as graduate work of Kyoto City University of Arts.